Practical product help

EquipSpan practical manual

Use this manual as you work. Each topic explains when to use a record, the recommended sequence and the boundaries that prevent one action from changing another unexpectedly.

Version 1.3 · Updated 18 August 2026 · English
01

Getting started

Set up the first real equipment record

Create a useful customer → site → equipment foundation without preparing a large migration first.

Step by step

  1. Check the workspace defaults

    Open Regional settings and confirm the business country, locale, timezone, date format, document paper size, currency presentation and working tax labels. These values control how dates, amounts and PDFs are presented.

  2. Create one real customer

    Open Customers, choose Add customer and enter the stable information your team already knows. A name is enough to start; add contact, company and address details when they help the work.

  3. Add the installation location

    Open the new customer and add the actual site where equipment is installed. Use a clear site name such as Main office, Plant 2 or Riverside store instead of repeating only the customer name.

  4. Register one installed unit

    From the location choose Add equipment. Record a useful name and the identity you have: manufacturer, model, serial number, asset reference, installation date or status. Missing optional data can be completed later.

  5. Attach useful evidence

    Open the equipment and add a nameplate photo, purchase document, commissioning record or another file that will help the next person identify or support the unit.

  6. Record coverage only when supported

    If the team has a warranty or service agreement to track, create a manual coverage record and link the supporting files. Leave the assessment as Not reviewed when the evidence is incomplete.

  7. Add the first operational next step

    Create a service request if something already needs attention, or add a recurring maintenance plan when future work is known. EquipSpan becomes useful when the equipment identity is connected to what happens next.

02

Getting started

Run the daily after-sales workflow

Use Overview, Requests and Schedule as a practical order of work rather than relying on memory.

Step by step

  1. Open What needs a look

    Start in Overview. Review overdue and upcoming requests, coverage records that need attention, maintenance inside its reminder window and equipment records missing useful identity or evidence.

  2. Deal with overdue next actions

    Open each urgent card and decide the real next action. Update the request, record a treatment, prepare a proposal, schedule a visit or move the due date only when responsibility has genuinely changed.

  3. Review today's visits

    Open Schedule and filter the agenda. Confirm the assignee, time, expected duration, access instructions and preparation checklist before the person travels.

  4. Capture new issues as requests

    When a call, email, web form or internal observation arrives, create a request against the site and, when known, the installed unit. Give every open request a concrete next action.

  5. Record work where it happened

    Use a treatment for remote work, calls, decisions and notes. Use a visit execution only when somebody actually attends the site. Both contribute to the chronology without automatically closing the request.

  6. Close the operational loop consciously

    After the work, review the request separately. Decide whether it is resolved, needs a follow-up, awaits a part or proposal, should be charged externally or requires a supplier claim.

03

Equipment foundation

Create customers and installation locations

Separate the commercial customer from every physical place where its equipment is installed.

Step by step

  1. Open Customers

    Search first to avoid creating the same customer twice. Change the status filter if the customer may have been archived.

  2. Add the customer

    Choose Add customer and enter the name plus any useful company, contact, tax reference, phone, email, website or notes. Save stable context here, not the details of one incident.

  3. Open the customer detail

    Select the saved row. The detail is the customer-level starting point for sites, installed equipment and secure request links.

  4. Add each real installation site

    Choose Add location and record a recognisable location name, address, site contact and access notes. Create separate locations when technicians need to distinguish where equipment physically sits.

  5. Continue from the location

    Use Add equipment to register a unit directly in the correct context, or create a secure request link scoped to that customer and site.

  6. Archive instead of deleting history

    Archive a customer or location that is no longer active. Its installed-equipment and service history remains connected and can be restored later.

04

Equipment foundation

Register equipment and its important components

Give the physical unit a durable identity that remains useful across many requests and visits.

Step by step

  1. Choose the correct customer and site

    Open Equipment and select Add equipment. Confirm the customer first and then the installation location; this relationship is the physical home of the record.

  2. Name the unit for daily use

    Use the wording the team recognises on calls and visits, such as Rooftop heat pump 4 or Packaging line printer. The generated equipment code remains stable for search and exports.

  3. Record available identity

    Add manufacturer, model, serial number, asset reference, installation date and status when known. Partial information is acceptable, but a nameplate photo is useful when the serial cannot be typed confidently.

  4. Save practical context

    Use notes for stable equipment information such as position, access, configuration or known constraints. Put incident-specific observations in the request or visit instead.

  5. Add components selectively

    Create a component when it has its own serial, model, coverage, document or replacement relevance. Examples include a compressor, controller, battery bank or indoor unit.

  6. Use Create similar for repeated units

    When several related units share most details, create the first carefully and use Create similar. Check the site, serial and asset reference before saving each copy.

  7. Keep lifecycle status current

    Update the status when a unit is inactive, replaced or retired. Do not remove the record merely because the current job is complete; the long-lived history is the purpose of EquipSpan.

05

Equipment foundation

Attach documents and photographs in context

Store evidence where another user will naturally look for it instead of creating a separate photo archive.

Step by step

  1. Decide what the file proves

    Before uploading, decide whether the file belongs to the installed unit, one component or one visit. This determines where it will appear in history and exports.

  2. Open the correct equipment

    For nameplates, invoices, manuals, commissioning records and general equipment photos, open the equipment detail and choose Add document.

  3. Choose the target

    Attach the file to the equipment or select a component. Use a useful kind and description so search results explain the evidence without opening it first.

  4. Upload a supported private file

    Choose the document or photo from the device. The current maximum is 10 MB per file. EquipSpan stores it privately and provides preview or download where supported.

  5. Link evidence to coverage

    When adding or editing a coverage record, select the already stored files that support the dates, scope or internal assessment.

  6. Use visit photos for field work

    During a visit, add work photographs in Execute visit. They remain part of that intervention instead of becoming unrelated files in the general equipment record.

  7. Correct completed-visit photos carefully

    An Owner or Manager can add a better photograph or remove a mistaken one after completion without reopening the visit. The report remains completed and the correction is preserved in activity. A Technician sees completed evidence as read-only.

06

Equipment foundation

Record warranty or service coverage manually

Preserve the team's working assessment, its source and its review dates without presenting a legal decision.

Step by step

  1. Prepare the supporting evidence

    Upload the purchase, installation, commissioning, warranty or contract documents to the equipment or component before recording a confident assessment.

  2. Choose Add coverage

    Open the equipment detail and create a coverage record with a clear name and type.

  3. Identify the provider and reference

    Record the manufacturer, installer, supplier or contract provider plus any external reference that helps a future enquiry.

  4. Enter dates only when known

    Add start, end and last-reviewed dates from the available evidence. Date state and human assessment remain separate: a current date range does not prove that a particular repair is covered.

  5. Choose an internal assessment

    Select Not reviewed, Insufficient information, Probably covered, Not covered, Mixed coverage, Expired or Closed. This is a team working status, not an automatic legal conclusion.

  6. Describe scope and limitations

    Record whether parts, labour, call-out or scheduled maintenance appear to be included, and preserve known exclusions or unanswered questions.

  7. Link the source files

    Select the files that support the record, save it and review the coverage card whenever new evidence or a provider decision arrives.

07

Requests and decisions

Register and control a service request

Capture the issue, its context, responsibility and next action whether or not a visit will be needed.

Step by step

  1. Search before creating

    Open Requests and check whether the same issue is already open. Use status, assignee and text filters to avoid splitting one case into duplicates.

  2. Choose Add request

    Select the customer and required installation location. Link the installed unit when it is known; a site-level request can be created when the exact equipment is not yet identified.

  3. Describe what needs attention

    Write a short title and enough description for another person to understand the symptom, timing and relevant context. Select the source and priority.

  4. Assign responsibility when useful

    Choose an assignee if one person owns the next operational action. Unassigned work remains visible but should not be allowed to drift.

  5. State the next action

    Every open request must contain a concrete next action. Add a due date when the team should review or perform it.

  6. Choose the honest status

    Use the status that describes the request itself: new, awaiting information, triaged, awaiting quote, awaiting authorisation, scheduled, in progress, on hold, resolved, closed or cancelled.

  7. Continue without forcing a visit

    Record a treatment for a phone call, email, remote action, assessment, decision, note or resolution. Schedule a visit only when attendance is genuinely required.

  8. Review after every major event

    A proposal decision, completed visit, supplier response or maintenance completion does not silently close the request. Update its status and next action consciously.

09

Requests and decisions

Record treatment and keep the next action explicit

Build a reliable chronology of remote and office work without pretending every intervention is a site visit.

Step by step

  1. Open the request

    Select the request whose chronology should receive the action. Confirm that the customer, site and equipment context is correct.

  2. Choose Record treatment

    Select the kind of work: Assessment, Contact, Remote action, Decision, Note or Resolution.

  3. Record the channel

    Choose Internal, Phone, Email, Remote, On site or Other so the chronology records how the action took place.

  4. Write an outcome-focused summary

    Record what was learned, decided or done and what information remains missing. Avoid copying an entire conversation when a concise operational summary is clearer.

  5. Save the chronology entry

    Treatments are append-only operating history. They identify who recorded the event and when.

  6. Update the request separately

    After saving, review the request status, assignee, next action and due date. The treatment deliberately does not change them behind the user's back.

10

Requests and decisions

Prepare and record a work proposal

Create an itemised commercial proposal inside the request and preserve the customer's decision.

Step by step

  1. Confirm regional settings first

    Before issuing the first proposal, verify currency, separators, decimal precision, tax vocabulary, tax rates, date format and A4 or Letter paper. These settings shape the customer-facing PDF.

  2. Open the request and choose Draft work proposal

    The request supplies the customer, site and equipment context. Give the proposal a clear title, validity period and practical scope.

  3. Add itemised lines

    Enter a description, quantity, unit price, discount and tax rate for each item. EquipSpan recalculates totals on the server using the configured regional precision.

  4. Separate customer and internal context

    Use customer-facing notes for conditions or explanations that belong in the PDF. Keep internal commercial or supplier context in the appropriate private records.

  5. Review and issue

    Check the item descriptions, totals, currency, dates and customer identity before issuing. Issuing locks the commercial details represented by that proposal version.

  6. Download and send the PDF

    Download the proposal PDF and send it through your normal communication channel. EquipSpan records the proposal; it does not claim that an external email was delivered unless that function exists in the current workflow.

  7. Record the decision

    When the customer responds, record accepted, rejected or another available outcome, who decided, the channel, date and notes.

  8. Move the request forward

    After acceptance, decide whether to schedule a visit, record remote treatment or update another next action. The proposal decision does not silently complete operational work.

11

Visits and field work

Schedule and prepare a site visit

Turn an open request into a clear appointment without treating scheduling as completed work.

Step by step

  1. Open the request

    Confirm the request's customer, installation site and equipment. If the unit is still unknown, the site context remains available for the visit.

  2. Choose Schedule visit

    Enter the purpose, date, start time, expected duration and assignee. The request fixes the operating context for this appointment.

  3. Add access and preparation notes

    Record site access, contact, safety or arrival information that the assigned person needs before leaving.

  4. Complete the preparation checklist

    Review customer confirmation, site access, previous history and whether tools or parts are accounted for. Mark an item complete when it has been done or consciously reviewed as unnecessary.

  5. Use Schedule as the agenda

    Filter upcoming, today, past, completed or cancelled visits and use assignee filtering to understand each person's work.

  6. Update before travel

    If time, assignee, preparation or cancellation changes, edit the visit before execution so the mobile view reflects the current plan.

12

Visits and field work

Execute the visit from a phone or tablet

Capture diagnosis, work, checklist, photos, outcome and optional acknowledgement while the context is fresh.

Step by step

  1. Open the assigned visit

    From Schedule, select the appointment and verify the customer, site, equipment, request purpose and preparation details before starting.

  2. Start or continue execution

    Open Execute visit. The record can remain Not started, In progress or Paused until the field work is ready to complete.

  3. Record the technical narrative

    Enter diagnosis, work performed, readings or tests, parts and materials, outcome and follow-up notes. Write enough for the office and the next technician to understand what happened.

  4. Build and complete the checklist

    Add the checks relevant to this visit and mark each item as it is completed. Use specific labels that remain meaningful in the final report.

  5. Add photographs of the work

    Take a photo or choose one from the device, add a useful description and upload it. These images become part of the visit evidence.

  6. Capture optional receipt acknowledgement

    When appropriate, record the recipient name and signature as acknowledgement of the report. Do not present this as automatic acceptance of price, coverage or legal liability.

  7. Save progress when the work is not finished

    Use Save progress before leaving the form or when the intervention pauses. A partially completed record remains available for the authorised user.

  8. Complete the visit report

    Review the checklist, text, outcome, photos and optional signature, then choose Complete. The visit leaves the active agenda, but the parent request still needs an office decision.

13

Visits and field work

Review and download the visit report PDF

Produce a readable intervention record using the workspace's dates, numbers and A4 or Letter paper setting.

Step by step

  1. Open the completed visit

    Go to Schedule, include completed visits if necessary and select the relevant appointment.

  2. Review the on-screen evidence

    Check the customer and site, equipment, technician, timing, diagnosis, work, readings, parts, checklist, outcome, follow-up, photographs and optional acknowledgement.

  3. Correct photograph mistakes if authorised

    An Owner or Manager may open execution and add or remove a visit photo. Confirm the corrected evidence before generating the final PDF.

  4. Download the PDF

    Choose Download PDF. EquipSpan applies the workspace's regional presentation, date format and configured A4 or Letter page size.

  5. Inspect before external sharing

    Open the generated document and confirm that it contains the intended information. Decide whether internal notes, evidence or signatures are suitable for the recipient.

  6. Return to the request

    Use the completed report as evidence, then update the request's status and next action separately.

14

Commercial follow-up

Track supplier recovery and customer charging separately

Keep the repair, supplier claim and customer-billing decision visible as separate but connected records.

Step by step

  1. Review coverage and evidence

    Open the request and equipment history. Check the manual coverage assessment, supporting files, visit photos, diagnosis, parts and proposal before deciding how the cost should be handled.

  2. Create a claim when recovery is pursued

    Choose Create claim, identify the provider, external reference, linked coverage and what is being claimed. Set a clear next action and due date.

  3. Move the claim through its own statuses

    Use Draft, Awaiting evidence, Ready to submit, Submitted, Awaiting supplier, More information required, Approved, Partially approved, Rejected, Recovered or Closed as the external process advances.

  4. Record values without treating them as accounting

    Enter claimed, approved and recovered amounts when useful. They are operational tracking values, not invoices, credits, bank entries or tax records.

  5. Attach and preserve claim evidence

    Link the relevant equipment files and keep provider responses, notes and dates in the claim record. Update the next action until recovery is actually complete.

  6. Record the customer charge decision separately

    Use Record customer charge to state Not chargeable, Included in contract, Chargeable, Partially chargeable or Waived, plus the intended amount and reasoning.

  7. Report external invoicing milestones manually

    Move the charge through Ready for external invoice, Invoiced outside EquipSpan, Payment reported, Written off or Not applicable only when that event has actually occurred in the external system.

  8. Update the request independently

    The request may be operationally resolved while a claim remains open, or a charge may be reported while technical work continues. Keep each status honest rather than forcing one global closure.

15

Recurring work

Create recurring maintenance and reminders

Make repeat work visible before it is due and deliberately convert it into a request when action is needed.

Step by step

  1. Open the equipment

    Select the installed unit that receives the recurring work. Add a component first when the recurrence belongs to a specific sub-unit.

  2. Choose Add maintenance plan

    Give the plan a clear operational name and choose the maintenance kind, related component when applicable and responsible user.

  3. Define the recurrence

    Set the interval and unit, such as every 3 months or every year. Choose whether the next date advances from the scheduled date or from the actual completion date.

  4. Set the next due date and reminder window

    The reminder-days value controls when the plan appears in What needs a look. A plan becomes due soon when its window starts, due today on the date and overdue afterward.

  5. Prepare the reusable request scope

    Record the request title, priority and scope that should be carried forward when the office decides to create a service request from this plan.

  6. Create a request consciously

    When the reminder needs action, choose Create request. This creates the operational case; it does not automatically create a visit.

  7. Record completion

    After the maintenance has genuinely occurred, record its completion date, optional linked request and notes. EquipSpan preserves the completion and calculates the next date according to the selected basis.

  8. Review both records

    Completing maintenance does not close or otherwise change a linked request. Update that request separately, then confirm the new next due date.

16

Control and recovery

Find a record and work by exception

Search across the workspace, then use portfolio exceptions to decide what deserves attention.

Step by step

  1. Start with the strongest identifier

    In Overview search for the customer, site, equipment code, serial number, asset reference, component, maintenance name, coverage, claim, photo or document description.

  2. Open the matching context

    Select a result to move to its customer or equipment detail. EquipSpan keeps the physical and operational relationships available around the match.

  3. Use What needs a look

    Return to Overview and select All attention, Operations, Coverage, Maintenance or Record quality.

  4. Read the reason, not only the count

    Each exception explains why the record is visible: overdue action, current reminder window, coverage review, missing identity or missing useful files.

  5. Open and resolve the underlying condition

    Update the real request, maintenance, coverage or equipment record. The dashboard count should change because the source record is better, not because an exception was dismissed.

17

Control and recovery

Export registers and an equipment evidence package

Take structured data into a spreadsheet or preserve one equipment context with files and checksums.

Step by step

  1. Choose the export purpose

    Use Equipment register CSV for the installed base, Maintenance schedule CSV for forward planning, or the equipment ZIP when one unit and its evidence need to be reviewed together.

  2. Select the intended scope

    For equipment choose current or all records. For maintenance choose active or all plans. Avoid exporting more personal or operational information than the recipient needs.

  3. Download the CSV

    Open Reports & exports and choose the relevant Download CSV action. The files use portable UTF-8 data suitable for review in a spreadsheet.

  4. Open equipment before exporting evidence

    For a ZIP, open the specific equipment record and choose its evidence-package action. Confirm that the unit and customer context are correct.

  5. Inspect the package

    The ZIP can include record CSV files, components, coverage, maintenance history, requests, visits, checklists, claims, private files, visit photographs, signatures and a SHA-256 manifest.

  6. Review before sharing or archiving

    Read the included README and inspect sensitive files. Store or transmit the package using controls appropriate to your company and recipient.

18

Workspace administration

Add users and keep roles simple

Use Owner, Manager and Technician to provide practical access without building a complicated permission matrix.

Step by step

  1. Choose the smallest suitable role

    Owner controls the complete workspace and team. Manager controls operations and Technician users. Technician works with permitted operational records and assigned field work.

  2. Open Team and choose Add user

    Enter the colleague's real name, work email and role. Do not share one login between several people; activity is more useful when each action has an identity.

  3. Send the private activation link

    The person receives or is given a time-limited link to create a password and join the existing workspace. They do not create a separate company account.

  4. Review Pending access

    Resend or replace access when a link expires. Remove an invitation that was addressed incorrectly or is no longer needed.

  5. Change or deactivate access promptly

    When responsibilities change, adjust the role within the allowed hierarchy. Deactivate access when somebody no longer works in the workspace.

  6. Check the effect with real work

    Confirm that the user can see and update the records required for their role, especially assigned visits, without giving unnecessary team or commercial control.

19

Workspace administration

Configure international dates, money, tax labels and paper

Control presentation for many countries without assuming that language alone determines business formatting.

Step by step

  1. Choose country and language

    Set the business country and one of the supported workspace languages: English, Spanish, French, Italian, Portuguese or German. Language and regional locale are separate choices.

  2. Confirm locale and timezone

    Use a valid regional locale such as en-US or de-CH and the timezone where the business operates. Due states and displayed dates depend on the workspace timezone.

  3. Choose date and paper formats

    Select the required date pattern and A4 or Letter document paper. Do not infer paper solely from the interface language.

  4. Set currency presentation

    Enter the three-letter currency code, symbol, position and spacing. Choose thousands and decimal separators plus quantity, unit-price and amount precision.

  5. Review tax vocabulary and rates

    Country suggestions are editable starting points. Confirm the company ID label, indirect tax name and working rates with the business's qualified adviser when required.

  6. Use the live preview

    Check the example date, time, quantity, price, amount and tax presentation before saving. Decimal and thousands separators must be different.

  7. Generate test documents

    Create or use safe test records and inspect proposal and visit PDFs. Confirm dates, totals, separators, symbols, tax labels, line wrapping and page size before external use.

20

Workspace administration

Understand trial access, protect login and ask for support

Review trial or subscription access, choose the right team and storage allowance, protect login and ask for help without exposing secrets.

Step by step

  1. Review the trial before it ends

    The Owner can open Plan & access to see the exact trial dates, days remaining and current use of team seats and private storage. The equipment count is informational: customers, locations and installed equipment are unlimited on every paid plan.

  2. Compare plans by real capacity

    Team 3 includes 3 users and 15 GB, Team 8 includes 8 users and 60 GB, and Team 20 includes 20 users and 200 GB. Every plan includes the same functions. Active users and pending invitations occupy team places; storage is shared by the workspace.

  3. Choose monthly or yearly billing

    Select Monthly for a month-to-month subscription or Yearly for the price of ten months. Choose the plan and review the secure Paddle checkout, including the applicable tax and final total, before paying.

  4. Manage an existing subscription

    The Owner can change plan or billing period from Plan & access. EquipSpan shows Paddle's prorated amount before confirming an immediate change. Use the customer portal for payment details, invoices and cancellation controls.

  5. Resolve a failed payment

    If Paddle reports an overdue payment, Plan & access shows the exact seven-day grace deadline. The workspace remains editable during that period. Open the Paddle portal, update the payment method and settle the overdue amount before the deadline.

  6. Understand read-only access

    When the 21-day trial ends, a payment grace period expires or a subscription is paused, the server prevents workspace changes and external request intake. Existing records, search, reports, PDFs and exports remain available so the company can review and recover its information.

  7. Use an individual strong password

    Create at least 10 characters with uppercase and lowercase letters, a number and an accepted symbol. Do not reuse or share the password.

  8. Change a known password

    Open Security, enter the current password and choose a new one. Other active sessions are signed out after the change.

  9. Recover a forgotten password

    From sign-in choose the password-recovery action, enter the work email and use the private reset link. If the message is absent, check spam and confirm the entered address.

  10. Protect invitation and reset links

    Treat access links like temporary credentials. Do not forward them to another person and discard them after use or expiry.

  11. Report a practical support case

    Use the EquipSpan support page and include the workspace name, your user email, the record code, what you were trying to do, what happened and the approximate time. Screenshots are helpful when they do not expose confidential material.

  12. Never send secrets

    Do not email passwords, readable request links, reset tokens or unnecessary customer documents. EquipSpan support should not need your password.

Need more help?

Send the record details and the steps you followed—never your password.

Use the support form and include the workspace name, record code, what you were trying to do and what happened.

Contact EquipSpan